Churchill Hall, Northeastern University
Boston, Massachusetts
Challenge:
Evaluate the cause and extent of the cracking and spalling of the glazed brick on this four story classroom and office building, including the office of the president of the university.
Solution:
The glazed brick could not be matched with any modern brick. The major areas of deterioration were at the corners and the roof level spandrel. CBI designed the replacement of the brick in these areas with bands of limestone masonry. Sound bricks were salvaged from the bricks that were removed and this brick was used to replace spalled bricks in other areas. CBI also evaluated the condition of the roofing membrane and designed a replacement roofing systems for the building.
Select a Project
-
Architecture
-
Engineering
-
Historical Restoration
-
Building Envelope Forensics
- Lenox Hotel
- Campello High Rise
- Six High-Rises, Worcester Housing Authority
- Carl Hyman Towers Elderly Housing
- Charlestown High School and Community Center
- William James Hall, Harvard University
- Caswell Hall, Metcalf Hall and Miller Hall, Brown University
- Emeryville Courtyard by Marriott
- Sciences Library, Brown University
- Braintree High School
- Verizon (formerly Bell Atlantic)
- Marina Point Condominiums
- Harbor Towers Condominium Garage
- Bartlett Hall - University of Massachusetts
- Ventress Library
- McKay Laboratories, Harvard University
- Pierce Hall, Harvard University
- Rondileau Campus Center, Bridgewater State University
- Schlesinger Library, Radcliffe Institute for Advanced Study
- Media Art Center, Admissions building, Student Center & Academic Building
- Egan Research Center, Northeastern University
- Churchill Hall, Northeastern University
- Ryder Hall, Northeastern University
- Grayson House and Field House, UMass, Amherst
- Lowell City Hall
-
Not Afraid of the Unusual
-
Best of the Worst
Copyright © 2013 CBIConsultingInc.com All rights reserved.